St John’s Wood was completed at the end of 2014.
The total cost of our works, including fitting, was around £130,000.00 plus VAT for this project. The works that we carried out at St John’s Wood consisted of the following:
- Internal doors
- External doors
- Box sash windows
- Gym mirrors and walling
- French polishing handrails
- Shutters and boxing
- Refurbishment of parts of the listed building
- Panelling
- Fitting of furniture